Across
- 1. Short for the Bureau that the construction official is an agent of according to N.J.A.C. 5:23-2.18(g)
- 3. Loads associated with the weight of construction materials in the building
- 5. Emergency responder safety feature
- 9. International Code _______
- 10. A story that is not a story above grade
- 13. Subcode responsible for N.J.A.C. 5:23-3.18
- 15. In case of fire, these are typically out of service
- 20. The exception to residential minimum room area requirements
- 21. Additive in foam discussed in Summer 2025 CCC article
- 22. Automatic sprinklers are now required in these as of February 1, 2025
- 23. Maximum delay time in seconds for delayed egress locking system
- 25. Subcode responsible for gas piping installations
- 26. These zones include A, V and Coastal A
Down
- 1. Subcode responsible for inspection IMC ventilation systems
- 2. Decorative glass individually embedded in concrete or epoxy
- 4. 2021 NJ IBC Chapter 13
- 6. Short for bureau responsible for plan review in accordance with N.J.A.C. 5:23-3.11
- 7. Door hardware required for occupant loads of 50 or more
- 8. Section 602 of the IMC
- 11. These Group B use care facilities associated with same day surgery centers
- 12. A type of platform not considered as a portion of the floor below.
- 14. Shops permitted to be open to corridors in Group I-2
- 16. Residential window fall protection devices shall comply with _____ F2090
- 17. National Fire _______ Association
- 18. An architectural projection for used decoration
- 19. Type of ovens requiring fire extinguishers according to 2021 IBC table 906.1
- 24. Evacuation where the movement of occupants takes more than 3 minutes but less than 13 minutes