Across
- 8. JFMM V5: The Ship’s QAO should be a commissioned officer with ___________/______ experience.
- 9. NAVSEA S6430-AE-TED-010: Commercial marking of hose fittings should include both the manufacturer's name or _____ ____ and commercial part number.
- 11. JFMM V5: Who is responsible for supervising QA training of division personnel?
- 13. JFMM V4: Who oversees the correction of discrepancies on MSD system installations?
- 14. JFMM V5: What is QA Form 12?
- 15. JFMM V3: Who is ultimately responsible for ensuring that appropriate QA is maintained on all repairs, regardless of who performs the work?
- 17. Oil Spill Plan: __________ _______ is responsible for obtaining and distributing information related to oil spill notification and response procedures for port visits.
- 19. JFMM V3: For deployed maintenance periods, Commander, Fifth Fleet; Commander, U.S. Naval Force, Europe-Commander, Sixth Fleet; or Commander, Seventh Fleet schedule all Availability periods for ships in their respective AORs after receiving proposals from ___________ _________.
- 23. JFMM V7: The primary purpose of THIS trial is to conduct preliminary checks and tests necessary to ensure the ship is ready for operations at sea.
- 24. COMLCSRONONEINST 3540.2A: Unless otherwise designated by the CO or CDO, small boats will be fueled under direct supervision of whom?
Down
- 1. JFMM V5: The _________ _______ is responsible for monitoring the QAO's administration of the ship's QA Audit, surveillance, training and qualification programs.
- 2. COMLCSRONTWOINST 9264.1: The ___________ _______ will maintain an effective Lube Oil Quality Management Program.
- 3. COMLCSRONONEINST 3540.2A: In managing the FOQM Program, the MPA shall ensure action is being taken to seek, isolate, and correct any cause of contamination and ensure all actions are properly annotated in the ___ _______ _______.
- 4. JFMM V6: A ______ solely to establish a Fleet Technical Assistance request, is not required.
- 5. JFMM V5: Who is responsible for administering a Departure From Specifications system?
- 6. NAVSEA S6430-AE-TED-010: Rubber hoses installed in high pressure gas service may, after a period of time, develop _______ ________.
- 7. JFMM V4: The ___ is the vehicle by which work requiring formal control is authorized for accomplishment and tracked to completion or otherwise no longer requiring isolation or authorization.
- 9. JFMM V4: Tagouts shall be accomplished in accordance with the requirements of the ______ _____ ______.
- 10. JFMM V5: A ___ is the mechanism used to document and resolve a lack of compliance with any authoritative document, plan, procedure, instruction, etc.
- 12. JFMM V4: In preparation for INSURV inspections, ships routinely must maintain their ____ in accurate condition and continuously monitor and accurately report their own material readiness posture.
- 16. Oil Spill Plan: When in port, who is responsible for Ensuring appropriate entries are made in the Ship’s Deck Log and Engineering Log?
- 18. JFMM V4: Who may exempt diesel engines on small boats and craft from inspection requirements where the engine or boat configuration provides insufficient access to accomplish the inspection?
- 20. COMLCSRONONEINST 3540.2A: Fuel oil storage tanks will be sampled using Water Indicating Paste __ hours prior to getting underway
- 21. JFMM V4: Who is the DEI Program Manager?
- 22. COMLCSRONTWOINST 9264.1: Who is responsible to ensure all JOAP samples are submitted as required in casualty conditions to the JOAP testing facility?