Unit 4.04.02: Framing Procedures

123456789101112131415
Across
  1. 1. This is the first part of the framing to be installed
  2. 4. These ties are metal anchors used to connect rafters
  3. 5. In platform framing, the wall studs are __to the top plate and the sole plate. The plates should be the same width as the studs.
  4. 7. metal anchors are used to strengthen the __ of framing parts to each other so that toe nailing is reduced or eliminated.
  5. 10. These are nailed to the top plate at the top.
  6. 11. this is the type of framing used when a building is framed from the bottom to the top.
  7. 13. In conventional or “stick built” buildings, this is where rafters and other roof framing are built
  8. 14. what are platform and balloon two methods of?
  9. 15. In platform framing, the sole plate is attached on top of the __ which is attached to the top of the floor joists.
Down
  1. 2. Wall studs are nailed to this at the bottom
  2. 3. Most buildings use __ framing because the subfloor gives a platform to stand on while adding the framing parts above it.
  3. 6. __ in measuring, marking, cutting, and fastening framing materials is necessary to construct a building that is square, plumb, and has the right dimensions.
  4. 8. These are built off-site and erected so that the rafter, braces, and other roof framing are erected in one piece
  5. 9. Total rafter ______ includes the unit length plus the tail or overhang.
  6. 12. joist hangers, which are used to connect floor joists, eliminate the need for this