Across
- 7. Only stud that is not apart of rough opening, and runs from bottom plate to top plate.
- 8. Runs vertical in the inside of rough opening from bottom plate to header.
- 9. always straighter than any cut and should always go to the inside of all layouts.
- 10. Gives door or window frame strength to carry load, and sits on jack stud.
- 11. means it is a load bearing wall.
- 14. perfect 90 degrees plumb and level.
Down
- 1. 90 dregree or perpendicular from plumb.
- 2. Protrudes in
- 3. On the outside of all rough openings,and sits on ouside of jack studs.
- 4. non load bearing wall where the top of all studs except jack and sometimes cripple studs are anchored to
- 5. Where the layout happens, and all studs are anchored to this at the bottom.
- 6. Above or below all rough openings. if above rough opening will sit on header.If below rough opening will always be a window.
- 12. protrudes out
- 13. perfectly straight up and down, because of gravity.
