Across
- 1. hazardous waste containers must be kept ______ when not in use.
- 5. Phase 1 of waste is waste _________ were waste is created.
- 9. who shares the obligation for responsible, safe waste management
- 10. Labels must be ______ by the operator.
Down
- 2. the accumulation start ____ must be in a Month/Day/ Year format.
- 3. Employees are responsible for any waste we generate, from creation, while stored, during transportation, and until final disposal or recycling. This is called “cradle-to-______” responsibility.
- 4. In order to prevent labels from being torn or tapped over labels must be placed where on the drum?
- 6. Lables must be legible, not torn, not ______ over, and initial by the operator.
- 7. Labels must be placed next to each other without _________.
- 8. If EPA waste code D035 is present the word ____ must be added to the label.
