Across
- 4. How long into the incident should the decision be made to switch to body recovery because the casualty is no longer survivable? (6,7)
- 5. Working within the 3m safety cordon from risk area is known as the ________(4,4).
- 8. 6 DOWN should bring with them, comms, PFD and __________(10).
- 10. Module 1 water rescue protocols (5,5,5)
- 11. Module 1 water rescue crews can be deployed as _______________ (8,7).
- 13. If a helmet is worn then chinstrap should be __________(10).
- 14. If the casualty is to be young and/or small they should be considered __________(10).
Down
- 1. Crews operating within the 3m safety cordon should be donned in full fire kit and a __________(10).
- 2. The minimum number in which a crew should be deployed as for 6 DOWN and 11 ACROSS.
- 3. a method for deploying a 8 ACROSS ________(5,3).
- 6. Module 1 water rescue crews can be deployed as ________________ (10,6).
- 7. Water rescue unit is located at _______(7).
- 9. Extra protocol allowed for water rescue module 2
- 10. At _____minutes the IC should liaise with the senior officers from the other services (5)
- 12. sections of circular current that tends to flow in the opposite direction from the main river current, usually caused by an obstruction in the river such as a rock or fallen tree ______(6).
