World Quality Week 2024

1234567891011121314151617181920
Across
  1. 5. This is done on a regular basis with any equipment that is critical to quality (i.e. scales, temperature transmitters, etc.)
  2. 7. Defective or non-conforming material that can be processed again to bring into specification.
  3. 10. A Japanese term that means "to go to the place where things happen"
  4. 11. This _____ Disposition sheet allows us to properly move and use material which is not in unrestricted.
  5. 12. The instructions that inform operators how to make batches
  6. 13. Foreign Object ______, or FOD, is objects or materials which could accidentally enter a batch, causing contamination
  7. 16. Who owns Quality
  8. 17. This purge keeps moisture contamination, which can be a big problem for our customers, from the headspace of a container
  9. 19. The recipe
  10. 20. This chart helps us see what issues are having the biggest impact on our daily performance, or "tall bars"
Down
  1. 1. What 3 numbers and a letter must be present on any sample label?
  2. 2. When it comes to continuous improvement, this is a way of life!
  3. 3. When making a paperwork correction, you must have a single-line cross out, write ____ and date
  4. 4. This 4-letter acronym describes how the first lot of raw material received at the plant must be used first in a batch
  5. 6. Total good pieces produced the first time/total produced
  6. 8. All LWI and LOP documents should be stored in this database
  7. 9. the length of time for which an item remains usable and can be consumed
  8. 14. ____ Parts Per Million is a key quality metric, which measures products which did not meet customer needs and expectations.
  9. 15. This program provides us with the quality tools needed to achieve NO quality complaints or issues for our customers.
  10. 18. Non-conforming material that cannot be salvaged