Across
- 6. If you want to see the steam generators, you’ll have to go inside ____________.
- 9. C2R26 is scheduled for _________-______ days.
- 11. Always maintain a ______________ attitude.
- 12. TEAM Attributes:Thinking, ___________, aligned and motivated.
Down
- 1. C2R26 has a ____________ day bulk work window.
- 2. ________________ operates the plant.
- 3. Outage Slogan: You are a __________ of our success.
- 4. _______________ is the string of work that drives the outage.
- 5. The outage start date has been moved up to March ____________.
- 7. We have_______ refueling outages in 2024.
- 8. We must perform our work ___________ and with quality.
- 10. We typically have ____________ months between outages.
