Across
- 3. Request for Information submitted by the contractor
- 6. A system used for managing multiple projects
- 8. The biggest problem in design project management
- 9. This is one element that should be reviewed during the design process
- 10. A ________ bar chart is one way to display a project's design cost
- 11. Chapter 11 covered material on Design __________
- 12. Considering this factor leads to lower costs, better productivity, and earlier project completion
- 14. AKA "objective matrix"
- 15. One of the four main components in the design evaluation matrix
Down
- 1. What the design cost is measured in
- 2. The types of indexes included in the contract documents are Drawing, Equipment, and _____ Indexes
- 4. The third method listed for the design evaluation matrix criteria
- 5. Excessive ________ use is a primary source of errors in the contract documents
- 7. Relates to changes that alter the project's original scope
- 11. Type of attitude someone should have when participating on multiple small projects
- 13. _______ documents are produced by a design frim and include comprehensive material necessary to construct a project