ENGINEERS WEEK 2026

1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768697071727374
Across
  1. 6. — Field team setting stakes/collecting data (13)
  2. 10. — Clean, as a CAD layer (4)
  3. 14. — Vertical transport in buildings (8)
  4. 15. — Second half of the 2026 slogan (10)
  5. 16. — Sighting marks in a level scope (6)
  6. 18. — What holds a presentation board (5)
  7. 19. — Roadway drainage structure (7)
  8. 22. — Track element (4)
  9. 23. — What you drive to mark lines (6)
  10. 24. — Accessibility law initials (3)
  11. 26. — Stabilizer for clay soils (4)
  12. 28. — Move water away (5)
  13. 29. — Keep (6)
  14. 32. — Lake‑related (as in wetlands) (10)
  15. 35. — Rock slope protection (6)
  16. 36. — Spatial info set (7)
  17. 38. — Roof edge (4)
  18. 40. — Medium you compact (4)
  19. 42. — Solid‑waste facility (8)
  20. 45. — Document showing right‑of‑way (6)
  21. 46. — Paving material (7)
  22. 47. — Make flat (5)
  23. 49. — “Estimated time of” departure (abbr.) (3)
  24. 50. — PPE and tools, collectively (4)
  25. 52. — What a P.E. applies to plans (4)
  26. 54. — And the rest (abbr.) (3)
  27. 55. — Flow unit for stormwater calcs (abbr.) (3)
  28. 56. — Triangulated frame (5)
  29. 58. — Transportation dept. (abbr.) (3)
  30. 59. — Single plan page (5)
  31. 60. — Licensure for engineers (abbr.) (2)
  32. 61. — Erosion-control tube (6)
  33. 63. — What silt fence combats (7)
  34. 64. — Efficient lighting type (3)
  35. 65. — Pressure unit (abbr.) (3)
  36. 66. — Pavement border (4)
  37. 67. — Village near Madison (6)
  38. 68. — River segment (5)
  39. 69. — Travel way in a roadway cross-section (4)
  40. 71. — On‑site team (4)
  41. 72. — Span over water or roadway (6)
  42. 74. — Discipline for loads and frames (21)
Down
  1. 1. — Bring into line (5)
  2. 2. — Instrument in scanning/levels (5)
  3. 3. — The firm (15)
  4. 4. - What you do before you build (4)
  5. 5. — Old-school survey scope (7)
  6. 6. — Measure land (6)
  7. 7. — Adhesive for anchors (5)
  8. 8. — Detail added to a plan sheet (5)
  9. 9. — What you move in grading (5)
  10. 11. — Village where Jewell began (11)
  11. 12. — What designs must meet (4)
  12. 13. — Where runoff is conveyed (10)
  13. 17. — Kind of imagery used in GIS (6)
  14. 20. — Change fundamentally (9)
  15. 21. — Designing for runoff quantity/quality (21)
  16. 25. — Mapmaking tech for assets (abbr.) (3)
  17. 27. — Drawing note for height (abbr.) (4)
  18. 30. — Reduce friction or slope (4)
  19. 31. — Proposed vertical profile (9)
  20. 33. — Northwest Wisconsin city with Jewell presence (9)
  21. 34. — State for Spring Green & Madison (abbr.) (2)
  22. 35. — ADA element for grade change (4)
  23. 37. — Raise (7)
  24. 39. — Recorded right for access/utilities (8)
  25. 41. - Annual celebration of the profession (13)
  26. 43. — Service for acquiring project parcels (21)
  27. 44. — Discipline designing buildings and spaces (12)
  28. 48. — Curve measure (6)
  29. 51. — Public right‑of‑way (3)
  30. 53. — Set the slope (5)
  31. 57. — Plaster backing strip (4)
  32. 59. — Pro measuring boundaries (8)
  33. 62. — Joint filler (7)
  34. 65. — Saw cut (4)
  35. 70. — Concrete reinforcement (5)
  36. 73. — What contractors submit (3)