  1. 4. Scheduled waste generated can be stored on site for a maximum period of ______ months
  2. 5. During the pre-construction phase, the client must ensure that a ________ risk assessment has been completed.
  3. 6. One of the client’s key duties under the Construction Work and Design Management (CWDM) regulations is to appoint a PCW _____ before the construction phase begins.
  4. 9. Under Regulation 8, the client is responsible to ______ the Department of Occupational Safety and Health (DOSH) about the construction project.
  5. 10. Any incident that occurs on site must be reported to the Project HSE Department and management within ________hour.
  6. 11. Under Regulation 7 of the Environmental Quality Act(EQA)1974, the highest fine that can be imposed for a serious offence is up to ______ ringgit.
  7. 12. Erosion and sedimentation control structure used to slow down and spread stormwater runoff.
  8. 14. Material used to stabilize slope or drain to reduce erosion
  9. 15. The contractor must provide, maintain, and implement an _________ response procedure throughout the duration of the project.
Down
  1. 1. In addition to the fine on question 11 , the offence may also carry _______ imprisonment as part of the penalty.
  2. 2. The client must also appoint a Principal Construction Work ______ to ensure design-related safety responsibilities are fulfilled.
  3. 3. One of the arising safety concern in workplace which do not arise from physical substance is ______ hazard.
  4. 7. According to the Guidelines on Prevention Principles (GPP) under the Occupational Safety and Health Construction Work Design and Management, all parties should prioritize the _________ of risks before applying other operational controls.
  5. 8. The maximum financial penalty that can be imposed on a client for non-compliance is ________hundred thousand.