Lean CLE 6 Value stream

123456789101112131415161718
Across
  1. 2. time between two process steps
  2. 5. Future state of process is called
  3. 7. bridge between CSVSM and FSVSM is by creating _______
  4. 11. strain
  5. 12. the lower half of the VSM maps_______ flow
  6. 13. seven wastes
  7. 14. state of the process with zero NVA is called
  8. 16. ______the process is the Preferred method to capture VSM.
  9. 17. cycle time is considered as __by customer (acronym)
  10. 18. define ________of process before starting VSM
Down
  1. 1. waiting for approval is example of ____ activity as per lean
  2. 3. the upper part of VSM maps _____ flow
  3. 4. Current state of process is called
  4. 6. variation
  5. 8. ___________perspective required to map Current state VSM.
  6. 9. ______based is the least Preferred method to capture VSM.
  7. 10. eight waste is related to
  8. 11. waste is called as ______in Toyota.
  9. 15. time from start to end of the process