Newsletter

123456789101112131415
Across
  1. 3. Takes place after a new well is drilled and completed, after workover or after well stimulation
  2. 6. _______ line requires a second control line entering the SCSSV below the operating piston which creates hydrostatic balance on the piston
  3. 7. A Committee that have jointly produced guideline to standardize and optimize a complete end-to-end completion cycle
  4. 10. Some of the features of ____ are variable orifice size at any depth, deeper injection and automated gas lift production
  5. 11. Installation of horizontal subsea tree on rig crane eliminates equipment preparation at _________
  6. 12. ______ valve eliminates intervention job during EWT phase and eliminate tool retrieve time for reset cycle open/close
  7. 14. First interventionless downhole barrier valve installation in PETRONAS and in Asia
  8. 15. System that enables isolation, stimulation and gravel packing of multiple zones in single trip using same workstring
Down
  1. 1. One of the solutions to the challenges faced by ____ Drilling Campaign was WHCP modification by installing back pressure regulator between WHCP and Exit Block
  2. 2. Pro-G connect is an augmented reality _________ technology that enables completion supervisors to assist NDSV offshore remotely
  3. 4. Two-dome shaped disks that is run on bottom of the tubing or below a packer BHA to isolate tubing to set hydraulic packers.
  4. 5. There is no health without _______ health
  5. 8. Derived to design the well right to streamline completion cost efficiency over reserves volume and well integrity
  6. 9. An alternative sand control system that utilizes Shape Memory Polymer technology
  7. 13. TR1P technology is a system that combines upper and lower completion with remote ______ activation technology