Across
- 2. Which field do we place driver instructions in that pertain to the order?
- 6. When building split pickups and droppoffs what icon do we select?
- 8. What feature in Pak Energy is utilized to conduct research on tickets?
- 12. Which selection is chosen to add/remove drivers on current shift?
- 14. What feature on the driver tablet is to be utilized if Driver is having System issues?
- 15. What feature is utilized to confirm connectivity of driver on Pak Energy?
- 18. Who is responsible for updating/removing/re-assigning work at the end of shift?
- 19. What step must a ticket be at in order to "split/move" onto another driver?
- 20. What feature is utilized for modifying a driver's schedule?
Down
- 1. What are the two methods of creating a load?
- 3. What is the default number (3 x's back to back)entered for loaded mileage field if one is not auto populated or unknown?
- 4. What type of box populates when work is changed or message is sent on the driver's tablet?
- 5. Field 2 utilized for scheduled loads that specify quantity?
- 7. Which field does the customer reference number get placed?
- 9. Field 1 utilized for scheduled loads that specify the number of days?
- 10. What icon do you utilize in order to create a customization profile?
- 11. What must be selected when assigning loads from availability to driver?
- 13. What is the name of the feature you select when you right click on a drivers load for diversions?
- 16. What is the driver details feature used for?
- 17. A form of templated automation when building loads?
