Across
- 3. These are used to trigger actions using senders and receivers
- 4. Generic name for containers used to transfer material within an MO
- 6. Generic name for containers used to keep stock of material eg. in a warehouse
- 7. Effective library elements can be used in an MBR as a copy or as ??
- 9. You should perform this BF before using any material in a MO
- 12. This is a range specified to compensate for the (in)accuracy of a weighing scale.
- 13. You perform this EQM BF when allocated equipment needs to be released
- 14. Container, scale, workroom, set-up parts are a type of ??
Down
- 1. If this time interval expires, the order HU cannot be used in the succeeding process steps
- 2. Outermost layer of MBR which can contain Basic functions inside it
- 5. Acronym for active material with potency
- 8. This represents the current equipment status
- 10. MBR in this life cycle stage can be used for production (eg. Draft/Inactive etc.)
- 11. Term used to say you will use all the material present inside an SU/HU
