Across
- 6. MUST PERSONALLY INSPECT ALL TANKS AND VOIDS
- 12. RESPONSIBLE FOR THE PROPER CARE, STOWAGE, USE OF FUEL AND LUBE OILS
- 14. THE FINAL QUALIFYING AUTHORITY FOR EDO
- 16. REPAIRS THE ENGINEERING OFFICER MUST PERSONALLY INSPECT ALL GAS TURBINES AFTER _______ ______ _______
- 17. AS AN ENGINEER, IF YOU FALL YOU HAD BETTER FALL ___________
- 19. OVERSEE THE ADMINISTRATION OF THE DC PQS PROGRAM
- 20. USERS GUIDE GOVERNING DOCUMENT FOR DEVIATIONS FROM EOSS
- 21. CO AUTHORIZATION IS VALID FOR REPEATED ENTRY INTO TANKS AND VOIDS ON OPENED AND CERTIFIED SO LONG AS THEY _________ ________
Down
- 1. SAFE PLANT OPERATING GUIDELINES ARE MAINTAINED IN _________
- 2. GRANTED SIGNATURE AUTHORITY FOR THE ENGINEERING LOG DURING THE INPORT DUTY PERIOD
- 3. DAMAGE CONTROL OFFICER
- 4. ASSIGNS THE CO THE RESPONSIBILITY OF THE SAFE AND PROPER SUPERVISION, OPERATION, AND MAINTENANCE OF THE ENGINEERING PLANT.
- 5. ALL BREAKERS MUST BE LEFT IN THE ON POSITION UNLESS _______ _________
- 7. IN THE ABSENCE OF THE CHENG THE CO MUST AUTHORIZE VIA LETTER OF DESIGNATION OR ___________ _________ _________ THE MPA OR QUALIFIED PERSONS TO PERFORM CG/SG CLOSE OUT
- 8. USED BY THE CHENG TO ISSUE INSTRUCTIONS FOR CONDUCT OF ROUTINE AND SPECIAL EVOLUTIONS PLANNED FOR THE EVENINGS.
- 9. UNDER THE CHENG THERE WILL BE OFFICERS AND SENIOR ENLISTED PERSONNEL SUCH AS THE MPA, DLCPO, AUXO….
- 10. LIMIT THE IMPACT OF AND CONTROL BATTLE DAMAGE
- 11. SUPERVISE THE PREPARATION OF THE DAILY FUEL AND WATER REPORT
- 13. ENSURE PROPER ADMINISTRATION, SUPERVISION AND REGULATION OF THE ERO09 WORK CENTER
- 15. RESPONSIBLE FOR THE COLLECTION AND STORAGE OF ENGINEERING RECORDS AND LOGS
- 18. SPARE BREAKER POSITION
- 22. COMLCSRONTWOINST 3540.4
