Topaz CW #12

123456789101112131415
Across
  1. 5. Mud Engineer with a GOOD name
  2. 6. Cards used on the topaz for safety observations
  3. 7. Phase of the well done after the completions is done
  4. 8. Used to take the crew from Surabaya to the rig
  5. 10. Phase of the well started once the drilling is done
  6. 13. Used to circulate the well while drilling
  7. 14. Used on the rig floor to make up BHA connections
Down
  1. 1. Weekly Sunday event
  2. 2. Type of rig the Topaz is
  3. 3. Produced by REACH weekly to let everyone know how the rig is doing
  4. 4. The Doctor presented this bad habit at the last safety meeting
  5. 5. What we are drilling with in the 8 1/2" section
  6. 9. The person who has to call 333 the most!
  7. 11. Type of flying insect that can injure you if you swat it on your body
  8. 12. Type of completion on Z6
  9. 15. What we are drilling for on this platform